Latest Articles

Shilo village fairy ring

Drill stem test

A Flow test is an operation on a well designed to demonstrate the existence of moveable petroleum in a reservoir by establishing flow to the surface and/or to provide an indication of the potential productivity of that reservoir. Some flow tests, such as drill stem tests (DSTs), are performed in the open hole.drillstem test 1. n. [Drilling] A procedure to determine the productive capacity, pressure, permeability or extent (or a combination of these) of a hydrocarbon reservoir. While several different proprietary hardware sets are available to accomplish this, the common idea is to isolate the zone of interest with temporary packers.Upon completion of this module, the participant should be able to: prepare the well for open-hole logging operations and take steps to ensure that such operations proceed smoothly, alert the wellsite geologist and service company logging engineer of hole conditions that may require modifications or special precautions in the logging program, assist in planning and carrying out a drill stem ...This interval was tested by an open hole drill stem test. Due to mechanical limitations of using test equipment in the small diameter well-bore, only limited volumes of well fluids were produced.Science, Technology, Engineering, and Mathematics (STEM) education is essential for children’s future success in the workforce. However, many students find these subjects intimidating or boring. As a result, educators and parents must find ...The first drilling stem test, a method of determining extractable reserve, reveals that the pressure in the deepest layer is around 3,500 PSI and the gas flow is over 14 million cubic feet a day ...Documents from the KCC. Intent To Drill Well (received by KGS Oct 16, 2013) ; Well Completion Report (received by KGS Jan 16, 2014) ; Drill Stem Test (received by KGS Jan 16, 2014) ; Cement Tickets (received by KGS Jan 16, 2014) ; Pit Closure - Drilling Pit (received by KGS Jul 22, 2014) ; Plotted Geological Report/Mud Log (received by KGS Jan 16, 2014) ; Waste Transfer (received by KGS Jan 03 ...Drill Stem Test (DST) Data and Images – Determine potential productivity, pressure, permeability, and extent of an oil or gas reservoir or formation in an open well bore – Linked with the Well and Engineering datasets to assess a reservoir or formation’s complete geological configuration Field, Pool & Unit BoundariesAnalysis of Drill Stem Test John Ansa Drill stem testing follows the basic principles of mechanics, hydromechanics, common sense and practicability. This seminar paper will present methods for the quantitative analysis of drill stem test.A drill-stem testing program can be planned for a well so that the tests will be made in accordance with one of three general methods: Test possibly productive intervals in open hole as the zones are penetrated; normally, this method is used in... Test possibly productive intervals in open hole ...The solutions for the slug test (decreasing flowrate) drill stem test (DST), including wellbore storage and skin effect, were presented by Ramey et al. in 1975. In field data from slug test DSTs, an initial period of constant flowrate can often be ob- served. A new model which includes the initial constant flowrate for a slug test was developed.In recent years, educators have been searching for innovative ways to engage students in learning STEM subjects (Science, Technology, Engineering, and Mathematics). One platform that has gained significant popularity is Minecraft Education ...Once the company wraps up drill stem testing at Venus-1A, it will re-enter Venus-1X, where it made its initial discovery of light crude oil and gas condensate. At that second site, it will drill a side-track and conduct another round of drill stem testing “to further evaluate the Venus reservoir,” Impact said.Flow Period Section. Drill Stem Test. The Flow Period section of the Drill Stem Test report uses a table with detail area below to capture details of the wells flow period summaries and flow rate data for each period.. For information on using spreadsheets and tables, see the Spreadsheets and Tables topic.. Special Fields and FunctionsHigh-resolution pressure and temperature measurements are key data for reservoir assessment or well management. They are used in drill stem test, DST, or wireline formation test, WFT, to estimate reservoir permeability, fluids present, flow rate and oil/water interface for optimal well completion.When drilling a pilot hole for a #8 standard wood screw in hardwoods, one should use an 11/64-inch tapered drill bit. A 5/32-inch bit should be used for drilling into softwoods. When using square drive screws, a standard point drill bit sho...The plots and equations that quantify the Drill stem well test interpretation for the discovery well 15-9/19-SR are presented here. The Horner plot for the main build up period. The Horner plot meant to study for the main build up period. The time function is also called Horner time is: \frac{t_{p}+\triangle t}{\triangle t}Hamilton, Bermuda, July 13, 2017 - Seadrill Limited (SDRL or "the Company") has secured a firm contract for one well and one drill stem test with Statoil Brasil Óleo e Gas for the West Saturn in ...Toggle a column header to sort by heading type. Document Identifier Class Document Number Document Name File Size (KB) Date DownloadThe following is an example of a complete drill-stem test interpretation such as might be made from a typical "morning wire" drill-stem test summary in the form previously suggested. Initial shut-in pressure = Pisi = 2500 psi Final shut-in pressure = Pfsi = 2475 psi Q = 48 B.P.D Pisi – Pfsi = 2500 – 2475 = 25 psi Flow time = T = 60 min ...Toggle a column header to sort by heading type. Document Identifier Class Document Number Document Name File Size (KB) Date DownloadToggle a column header to sort by heading type. Document Identifier Class Document Number Document Name File Size (KB) Date DownloadPoor-productivity wells generally test between 500 and 800 ft (150 and 250 m) of total fluid on drill-stem tests. The two drill-stem tests in the Clarkson well recovered 735 ft (224 m) and 864 ft (263 m) of total fluid, with 60 to 70% water cut. Upon more careful examination the drill-stem test data suggest that this hydrocarbon show may be ...MFE By Pass Valve Open Hole DST Well Test Multi Flow Evaluator 10000 PSI . Brief of MFE By-Pass Valve. The MFE By-Pass Valve is Multi-Flow Evaluator applied for the open hole drill stem testing operation.Th MFE serves as a means to by-pass fluid through the packer when tight places are encountered while going in and coming out of the hole, and to equalize the pressure across the packer after a ... Means for lifting formation fluid to the surface in a drill stem test. The drill string has first openings allowing entry of formation fluid and upwardly spaced second openings which are normally closed by a sleeve slidably mounted on the drill string. Fluid pressure from within the drill string impinges on a transverse surface of the sleeve and forces it down, allowing …A drill-stem test is performed by setting a packer above the formation to be tested, and allowing the formation to flow. During the course of the test, the bore hole or casing below the packer, and at least a portion of the drill pipe or tubing, is filled with formation fluid. At the conclusion of the test, this fluid must be removed by proper ...Examples of Drill stem test in a sentence. Sufficient quantities of corrosion inhibitor should be on location to treat the drill string during Drill Stem Test Operations.. The data from these appraisal wells will be incorporated into the ongoing field development planning activities; • Following completion of the Ngamia-10 well, the rig was moved to the previously drilled Etom-2 well to ...Drill stem tests (DSTs) are used to obtain (1) samples of the reservoir fluid, (2) measurements of static bottomhole pressure, (3) an indication of well productivity, and (4) short-term flow and pressure buildup tests from which permeability and the extent of damage or stimulation can be estimated. [2] A DST is run in the open hole after ...• Well Test total collected data points are 72,682 • Borehole Lithology Intervals total collected data points 1,843,140 • Active Fault total collected data points 45,083 • Drill Stem Test total collected data points 13,952 . 5 *Services may include 2 -3 deliverables based on the state's annual Scope of Work (SOW)The handymen or construction workers’ toolbox is not complete without the best drills. Here, we’ve rounded up the best drills for repairs. handymen, and construction workers. * Required Field Your Name: * Your E-Mail: * Your Remark: Friend'...Documents from the KCC. Intent To Drill Well (received by KGS Feb 02, 2016) ; Well Completion Report (received by KGS Mar 31, 2016) ; Drill Stem Test (received by KGS Mar 31, 2016) ; Drill Stem Test (received by KGS Mar 31, 2016) ; Drill Stem Test (received by KGS Mar 31, 2016) ; Drill Stem Test (received by KGS Mar 31, 2016) ; Cement Tickets (received by KGS Mar 31, 2016)Pallanich. Hart Energy. Mon, 10/17/2022 - 04:00 PM. From a drill stem test library partnership to the U.S. government seeking comments regarding decommissioning offshore California, below is a compilation of the latest headlines in the E&P space within the past week.Pada umumnya peralatan Drill Stem Test terdiri dari peralatan diatas permukaan. dan peralatan dibawah permukaan, untuk lebih jelasnya akan diterangkan dibawah ini. 3.2.1.1. Peralatan Bawah Permukaan. Alat ini berfungsi mengisolir lapisan yang diuji terhadap tekanan kolom Lumpur. pada waktu pengujian berlangsung.This drilling program was used by the Deep Exploration Technologies Cooperative Research Centre (DET CRC) to test a range of new technologies developed in the CRC for mineral exploration. The data used in this analysis are provided as Supplemental data 1 and 2; this is a subset of the full MSDP data set available in Fabris et al. (Citation 2017).Well test design and analysis, Surface well test equipment, Drill-stem test tools, Wellhead safety systems, Surface and down-hole data acquisition, Data management and real-time transmission ...Here is their take on the seven most common cattle fencing mistakes. 1. Corner posts are undersized, or not deep enough. This ranks as the top mistake in fencing, be it barbed, high-tensile wire or woven wire. The main issues are undersized posts and corner posts not set deeply enough, particularly in sandy or soft soils.ENERGY ALLIANCE COMPANY INC HARE #1-12 API #: 009-06549: Toggle a column header to sort by heading type. Document Identifier Class Document Number Document NameType Testing of Rising Stem Valves Equipped with Flexible Graphite Packing for Fugitive Emissions: 2 : 02/28/2023: CRE ... Tubing, Line Pipe, and Drill Stem Elements: 4 : 02/13/2023: CSOEM : RP : 6HT: Heat Treatment and Testing of Carbon, Micro-alloyed, and Low-alloy Steel Wrought and Cast Components: 3The introduction and evolution of drillstem tests. In 1926 near El Dorado, Arkansas, Edgar and Mordica Johnston performed the first commercial drillstem test (DST). Frequent tests were necessary in the area because of the irregular nature and thinness of formations, but at the time, the only means of testing was to set casing, cement, and bail. Disposition of Oil (Purchaser and Transporter), and Gas (sold, used for fuel, vented, etc.) Test Witnessed By List of Attachments/Comments GEOLOGIC MARKERS FORMATION NAME AND BRIEF DESCRIPTION MEASURED DEPTH TRUE VERTICAL DEPTH Use additional page(s) if needed. DRILL STEM TEST DATA Drill Stem Test Results AttachedA drill stem test (DST) is a procedure for isolating and testing the pressure, permeability and productive capacity of a geological formation during the drilling of a well. A drill stem tester valve-Commonly run in the hole in the open position to allow the string to fill. This valve will perform the closure for the shut in portion of the well test, normally using ...The Polish Oil and Gas Company most commonly use double-cycle drill stem tests, which, in the case of inflow to DST tool oil or reservoir water, enable among others the evaluation of [1, 2 ...The zone tested condensate, gas, and water from a drill-stem test in the original hole at 17,400 ft. A commercial completion at this depth at Elk Hills will lead to additional deep tests in the reserve and may ge erate interest throughout the entire southern San Joaquin Valley for deeper plays by other oil companies.Toggle a column header to sort by heading type. Document Identifier Class Document Number Document Name File Size (KB) Date DownloadDrill Stem Test dilakukan untuk mengetahui karakteristik dari reservoir tersebut. Dengan mengetahui karakteristik reservoir suatu sumur maka dapat untuk merencanakan produksi sumur nantinya ...Documents from the KCC. Intent To Drill Well (received by KGS Aug 23, 2012) ; Well Completion Report (received by KGS Jan 15, 2013) ; Well Completion Report (received by KGS Mar 25, 2013) ; Drill Stem Test (received by KGS Dec 14, 2012) ; Drill Stem Test (received by KGS Dec 14, 2012) ; Drill Stem Test (received by KGS Dec 14, 2012) ; Drill Stem Test (received by KGS Dec 14, 2012)Toggle a column header to sort by heading type. Document Identifier Class Document Number Document Name File Size (KB) Date DownloadAbstract. This report documents the accomplishments achieved during the project titled "Multiscale Modeling of CO 2 Migration and Trapping in Fractured Reservoirs with Validation by Model Comparison and Real-Site Applications" funded by the US Department of Energy, Office of Fossil Energy. The objectives of the project were to develop modeling capabilities for predicting CO 2 and brine ...Documents from the KCC. Intent To Drill Well (received by KGS Feb 11, 2013) ; Well Completion Report (received by KGS Apr 12, 2013) ; Well Completion Report (received by KGS May 30, 2013) ; Drill Stem Test (received by KGS May 30, 2013) ; Cement Tickets (received by KGS May 30, 2013) ; Pit Closure - Drilling Pit (received by KGS Jul 03, 2013) ; Plotted Geological Report/Mud Log (received by ...

Read More »
Coolmathgames.com grindcraft

Si ku

The company has been extracting gas as an experiment from the exploratory well, Ilisha-1, since April 28, and the second drill stem test, down to 3.2km depth, will start this week, officials said ...Jet grouting creates in situ geometries of soilcrete (grouted soil) using a grouting monitor attached to the end of a drill stem. The jet grout monitor is advanced to the maximum treatment depth. Then high-velocity jets (cement grout with optional water and air) are initiated from ports in the monitor. ... An in situ test program is generally ...• Well Test total collected data points are 72,682 • Borehole Lithology Intervals total collected data points 1,843,140 • Active Fault total collected data points 45,083 • Drill Stem Test total collected data points 13,952 . 5 *Services may include 2 -3 deliverables based on the state's annual Scope of Work (SOW)Drill stem test: test number; interval; valve open time; gas, oil, or water to surface times and flow rates; recovered volumes; pressure data (chart and times).Wireline tests: test number, depth, duration, and recovery pressure data and times.Other articles where drill-stem test is discussed: petroleum production: Formation evaluation: …was historically employed was the drill stem test, in which a testing tool was attached to the bottom of the drill pipe and was lowered to a point opposite the formation to be tested. The tool was equipped with expandable seals for isolating the formation from the rest of the…Drill Stem Test (received by KGS Dec 14, 2012) KCC Technician's Plugging Report (received by KGS Dec 14, 2012) Operator's Plugging Report (received by KGS Oct 18, 2012) Pit Closure - Drilling Pit (received by KGS Nov 05, 2013) For information on software to view and useAccess critical reservoir data quickly and confidently with drill stem test (DST) tools from Baker Hughes. Whatever your drill stem testing goals, we have the tools and services to ensure that you get the answers you need—accurately and efficiently. Tools for every testing need. For more than 30 years, Baker Hughes has engineered and built ... The well was drilled to a total vertical depth of 13,818 feet subsea. The well encountered a 390 foot gas column in a high net-to-gross, fine-grained sandstone reservoir with associated permeability of 1-10 mD. A full data acquisition programme has been completed including wireline logging, 240 feet of core recovered and a drill stem test.Wellbore trajectory is controlled by the type of bottom hole assembly used and the weight on the bit. The bottom hole assembly, or BHA, is that portion of the drill string closest to the drill bit.It consists of several components: Heavy-weight drill pipe, which has the same outer diameter as regular drill pipe but with thicker walls for greater weight, used as a transition between drill ...drillstem test. 1. n. [Drilling] A procedure to determine the productive capacity, pressure, permeability or extent (or a combination of these) of a hydrocarbon reservoir. While several different proprietary hardware sets are available to accomplish this, the common idea is to isolate the zone of interest with temporary packers.Abstract. Drill-stem testing has advanced from simple sampling of the formation to complete pressure buildup analysis. This paper reviews the mechanical arrangement of the tool, its running and pressure measurements. Various typical drill-stern test pressure charts are shown as an aid in trouble-shooting.Purpose. THE ORIGINAL PURPOSE of drill-stem tests included recovery of a sample of the ...drill—stem test Significant show — drill—stem test recovered gas, gas flow -from well DRY HOLE no gas or oil shows recorded MP R boundary of area surveyed for oil and gas shows GAS FIELD BOUNDARIES Scale 10 Miles OIL AND 20 ARVE EDCWI K T, 24 S, T. .26 S. UTLE 960 20DRILL STEM TEST REPORT LLC 208 32nd Arm RLOBITE ESTING, GENERAL INFORMATION Lansing K 27-17-31 Scott, KS Bateman 61783 rest start: Test Type: 79 2015.11.01 ... results in Stem Test "3 in the Johnson Zone. It recommended to set ROCK TYPES OTHER SYMBOLS Lm st Meta salt Shale ca to u ate zone. Bent POROSITY Earthy Fenest Fracture Inter....

Read More »
Zillow brooks ga

Prediksi macau jp 100

"A drill stem test ( DST) is a temporary completion of a wellbore that provides information on whether or not to complete the well. The zone in question is sealed off from the rest of the wellbore by …If you want to have a water supply to your home that doesn’t cost you a fortune in monthly utility fees, a well is an excellent option. However, it’s expensive to hire a drilling company. If it’s legal in your area, you may be able to dig a...Float subs are available in a variety of sizes to accommodate the full spectrum of downhole drill stem sizes. ... side-entry subs are designed with a solid ID on one end made to pump through or pressure test. Saver Subs. Saver subs are used to extend the life of the drill stem component it is made up to by taking the wear caused by multiple ...The basic drill stem test tool consists of a packer or packers, valves or ports that may be opened and closed from the surface, and two or more pressure-recording devices. The tool is lowered on the drill string to the zone to be tested. The packer or packers are set to isolate the zone from the drilling fluid column.Following the completion of the Venus-1A drill stem test, TotalEnergies will re-enter and side-track the Venus-1x discovery well using the Deepsea Mira to conduct a second drill stem test. The oil company will then use the Tungsten Explorer drillship at Nara-1X, an exploration well on Block 2912, to drill the well and potentially flow test it.Documents from the KCC. Intent To Drill Well (received by KGS Sep 07, 2018) ; Well Completion Report (received by KGS Feb 21, 2019) ; Drill Stem Test (received by KGS Feb 21, 2019) ; Drill Stem Test (received by KGS Feb 21, 2019) ; Drill Stem Test (received by KGS Feb 21, 2019) ; Drill Stem Test (received by KGS Feb 21, 2019) ; Cement Tickets (received by KGS Feb 21, 2019)Documents from the KCC. Intent To Drill Well (received by KGS Oct 15, 2013) ; Well Completion Report (received by KGS Feb 06, 2014) ; Drill Stem Test (received by KGS Feb 06, 2014) ; Drill Stem Test (received by KGS Feb 06, 2014) ; Drill Stem Test (received by KGS Feb 06, 2014) ; Drill Stem Test (received by KGS Feb 06, 2014) ; Drill Stem Test (received by KGS Feb 06, 2014)Based on results so far, a decision has been taken to drill a sidetrack well and perform a drill stem test, Longboat said. ... based on pre-drill estimates. Related Articles. Sep 1, 2023 6:29:pm US backs Chevron in dispute with Cyprus over giant gas field Sep 1, 2023 11:46:am Aliso Canyon to store more gas to prevent winter price spikes ...Tel: (713) 981-5558 | Fax: (713) 981-5556 . [email protected] | [email protected]. Quick Links:Once the company wraps up drill stem testing at Venus-1A, it will re-enter Venus-1X, where it made its initial discovery of light crude oil and gas condensate. At that second site, it will drill a side-track and conduct another round of drill stem testing “to further evaluate the Venus reservoir,” Impact said.Drill stem testing is an oilfield technique that has considerable advantages. It produces fluid from the test zone, thus avoiding well bore damage on injection, it also tests using reservoir fluid rather than an injected fluid. Sigra undertakes permeability testing using its drill stem test tools. These are used in drill stem test (DST) mode to ...Analysis of Drill Stem Test John Ansa Drill stem testing follows the basic principles of mechanics, hydromechanics, common sense and practicability. This seminar paper will present methods for the quantitative analysis of drill stem test....

Read More »
Abbreviations for engineering

Decades consignment fort lauderdale

A full data acquisition programme has been completed including wireline logging, 240 feet of core recovered and a drill stem test," Harbour said in a statement. Gary Selbie, President Director ...Means for lifting formation fluid to the surface in a drill stem test. The drill string has first openings allowing entry of formation fluid and upwardly spaced second openings which are normally closed by a sleeve slidably mounted on the drill string. Fluid pressure from within the drill string impinges on a transverse surface of the sleeve and forces it down, allowing …Drill Stem Test (received by KGS Jun 19, 2013) Cement Tickets (received by KGS Jun 19, 2013) Pit Closure - Drilling Pit (received by KGS Dec 09, 2013) For information on software to view and use the files we distribute on our web pages, please view our File Format Tools page.Drill Stem Test (received by KGS May 18, 2012) Cement Tickets (received by KGS May 18, 2012) Pit Closure - Drilling Pit (received by KGS Sep 11, 2012) Plotted Geological Report/Mud Log (received by KGS May 18, 2012) For information on software to view and use the files we distribute on our web pages,Well Testing. Well testing is the process of measuring the changes of production or injection rate and the bottom-hole pressure of the testing well, i.e. obtaining input or output signals of the system. From: Streamline Numerical Well Test Interpretation, 2011.Documents from the KCC. Intent To Drill Well (received by KGS Jul 27, 2012) ; Intent To Drill Well (received by KGS Jul 31, 2012) ; Well Completion Report (received by KGS Dec 14, 2012) ; Well Completion Report (received by KGS Dec 03, 2012) ; Drill Stem Test (received by KGS Dec 03, 2012) ; Drill Stem Test (received by KGS Dec 03, 2012) ; Drill Stem Test (received by KGS Dec 03, 2012)Drill stem testing follows the basic principles of mechanics, hydromechanics, common sense and practicability. This seminar paper will present methods for the quantitative analysis of drill stem test. The drill-stem test operation is divided for discussion into three phases: planning the test, performing the test, and interpretation.Lay down 57 joints of 5" drill pipe. 甩57根钻杆; Pick up drill stem test tool. 提起钻杆测试工具; Circulate mud for 2 hours. 循环泥浆2小时; Move string during circulation. 在循环时注意活动钻具; Circulate hole clean. 循环清洗井眼; Circulate bottoms up. 循环泥浆几周; Fill up every 5 stands. 每5柱灌 ...Flow Period Section. Drill Stem Test. The Flow Period section of the Drill Stem Test report uses a table with detail area below to capture details of the wells flow period summaries and flow rate data for each period.. For information on using spreadsheets and tables, see the Spreadsheets and Tables topic.. Special Fields and Functions...

Read More »
Craigslist cars trucks san jose california

Msw and law degree

DRILL STEM TEST SERVICE Range of activity: • Drill Stem Tests in holes combined with measurement of the production rate, pressure and temperature • Using the Full-Flo testers we perform the wide range of operations while testing: - running geophysical probes into boreholes (e.g. to obtain production logs) - Slickline samplingWell Testing. Well testing is the process of measuring the changes of production or injection rate and the bottom-hole pressure of the testing well, i.e. obtaining input or output signals of the system. From: Streamline Numerical Well Test Interpretation, 2011. Well test design and analysis, Surface well test equipment, Drill-stem test tools, Wellhead safety systems, Surface and down-hole data acquisition, Data management and real-time transmission ...The company has been extracting gas as an experiment from the exploratory well, Ilisha-1, since April 28, and the second drill stem test, down to 3.2km depth, will start this week, officials said ...Prepare for any home project with these cordless drills. Whether you’re working on a large home improvement task or building new pieces of furniture, these drills offer the comfort, flexibility, and precision you need to make your project s...The plots and equations that quantify the Drill stem well test interpretation for the discovery well 15-9/19-SR are presented here. The Horner plot for the main build up period. The Horner plot meant to study for the main build up period. The time function is also called Horner time is: \frac{t_{p}+\triangle t}{\triangle t}A drill stem test ( DST) is a temporary completion of a wellbore that provides information on whether or not to complete the well. The zone in question is sealed off from the rest of the wellbore by …drill stem testing. a temporary well completion to gather information on the potential productivity of a formation. what is a drill stem test. who reviews the dst program. oim senior toolpusher operator rep key service personnel. key area’s of review. communication roles and responsibilities emergency response. expected test parameters ...In Block 2913B, the first appraisal well in the discovery, Venus-1A, will be drilled using the Tungsten Explorer drillship, followed by a Deepsea Mira drill stem test. Then, still using the Deepsea Mira, the Venus-1X exploration well will be re-entered and side-tracked to conduct a second drill stem test in order to evaluate the Venus reservoir.Drill Plug ($15 fee) Deepen/plug back Convert Pull/alter casing Formation treatment Details of Work Drilling application will state proposed TD & Horizons to be tested. Show size & length of casings to be used. Plugging application shall set forth reasons for plugging & detailed statement of proposed work.7-1 drill stem elements First Edition, March 2006 - ... a gas test at low pressure to 0,62 MPa (90 psi), using ambient-temperature air, shall be performed in accordance with appropriate subclauses in 5.4.3. No gas bubbles shall be observed in a 5 min test period.Baskin and Jones (1993) showed how geochemical data such as sulphur content, Rock-Eval S 1, and Rock-Eval S 1 /S 2 ratio of reservoir bitumen correlate with the gravity of associated drill stem test oils to yield prediction models for API gravity to ±4° API.Drill Stem Tests Database Specific Well--15-163-24283. API: 15-163-24283 Operator: Staab Oil Co. Field: Hobart Northwest Lease: Sharon Well 1 Location: T8S R18W, Sec. 28, SE NW SW NW 1720 South, 480 East, from NW corner ... Drill Stem Test. View PDF. Kansas Geological SurveyToggle a column header to sort by heading type. Document Identifier Class Document Number Document Name File Size (KB) Date DownloadObservation well USGS Site ID UTM East UTM North Land Net Land surface Well Interval Interval Thickness Radius or Geologic Unit Lithologic Description Date Date Analyzed Test type Avg pumping Analyzed Horizontal Hyd. Transmissivity Storativity Specific yield Analytical method "Sources of hydraulic-property data, " coordinate coordinate coordinate altitude Depth Top Bottom (meters) interwell ... or...

Read More »

Popular Articles

Other Articles